Construction of an 8-kilometer long business center along a highway.
- Construction time 3 years
- Floor space about 900,000 m²
- Thickness of floor slabs: 20 cm
- Room height 2.20 – 7.80 m
Hochtief Construction Qatar W.L.L., Doha
Location
-
BenefitsComprehensive complete solution
-
BenefitsFast assembly and cycle sequences due to coordinated formwork systems
-
BenefitsUsage and assembly drawings catered to the particular jobsite
-
BenefitsTrainings and instructions following the construction progress
-
BenefitsSmooth construction progress through 24h service
The Project
Impressions from the project process
The Barwa Commercial Avenue in the south of Doha extends to a total length of 8 kilometers.
The reinforced concrete columns with different dimensions were shuttered with TRIO column, VARIO column and LICO, so always with the optimal system depending on the requirements.
PERI UP Rosett scaffolding units were created for the forming, reinforcing and concreting of the columns. The HANDSET formwork for small areas was used to form the slab edges.
The modular-type PERI UP Rosett scaffold ensures safe load transfer at greater heights
The slab tables could be moved and positioned horizontally with the table striking and transportation trolley.
The UZR beam waler at the same time supports beam and slab formwork – also for large spans.
The Barwa Commercial Avenue in the south of Doha extends to a total length of 8 kilometers.
The reinforced concrete columns with different dimensions were shuttered with TRIO column, VARIO column and LICO, so always with the optimal system depending on the requirements.
PERI UP Rosett scaffolding units were created for the forming, reinforcing and concreting of the columns. The HANDSET formwork for small areas was used to form the slab edges.
The modular-type PERI UP Rosett scaffold ensures safe load transfer at greater heights
The slab tables could be moved and positioned horizontally with the table striking and transportation trolley.
The UZR beam waler at the same time supports beam and slab formwork – also for large spans.
Ghassan Kawash
Project leader
PERI did not only deliver the formwork to the jobsite – they offered us complete and jobsite-relevant solutions. As an expert formwork partner, PERI helps us with training, engineering and jobsite support.
Are you working on a project like this?
Call us on +965 9696 3619 to discuss your requirements further.