Sheraton 4 points Kuwait

Project data

Location: Kuwait City, Kuwait

A 42 floor tower with different floor heights as an extension for the existing old Sheraton. It rises over the old one by 22 floors with a space in between of 1.50 m only for the lower floors. 

Requirements

A self compacted concrete is required for casting the tower main core, which will be casted ahead of slab.A combination of different types of wall formworks with climbing systems is used to achieve the construction requirements, showing also flexibility and high productivity.A combination of different types of wall formworks with climbing systems is used to achieve the construction requirements showing also flexibility and high productivity. 

Customer

Al Bahar Construction
Company

Customer's benefit

Crane-independent and ergonomic working due to mobile climbing hydraulics, ideal for narrow spaces. Reliable lifting power of 100 kN raises the climbing unit to the next pour without the need of intermediate anchors.

Sheraton Kuwait
Eng. Mohamad Al-Zouman
Deputy General Manager

“Four Points Sheraton Expansionis a very challenging project and due to PERI’s help these challenges were simplified. The working space in the project area was very narrow and the distance between our wall and neighboring site was only 40 cm. But with PERI’s ACS P with Gallow system, it allowed us to lift the panels from the top without any side support - and this was exactly what we needed considering the narrow space. In my opinion, without PERI ACS P this scope of work would have been impossible.”

,

PERI solution

VARIO has been used for core and efficient straight walls. PERI RCS for the walls on the slab edge and for the shaft and gallows of the walls ACS P has been provided