You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

PERI UP Frame Working Scaffold T 72, T 104

PERI UP Frame Working Scaffold T72,T104: Fast and safe assembly with guardrail in advance.
PERI UP Rahmen-Arbeitsgerüste T72,T104: The scaffolder can work fast at safe conditions due to the system-integrated fall protection. The guardrail in advance for the next level is assembled together with the T-frame from the lower, already secured scaffolding level. No extra tools are required.
PERI UP Frame Working Scaffold: Due to the integrated lock against uplift, the deck is secured immediately after being put in place
PERI UP Frame Working Scaffold T72,T104: Fast guardrail assembly without additional tools. Integrated fixings for inner guardrail.
PERI UP Frame Working Scaffold T72,T104: End guardrails in advance allow fast and safe assembly
PERI UP Frame Working Scaffold T72,T104: Application example: job site in Ingolstadt, Germany.

Overview

Integrated safety and fast assembly with guardrail in advance

Load bearing capacity: 
up to Load Class 4 (PERI UP T72)
up to Load Class 6 (PERI UP T104)

With T-frames, facade scaffolding can be assembled quickly and safely by means of the guardrail in advance and self-securing steel decks.

The PERI UP T 72 / T 104 frame scaffold fulfills all scaffolding tasks which can be technically and cost-effectively realized with frame scaffolding. In addition, the system provides the user with an extraordinarily high level of safety which makes the harness protection required in many countries unnecessary. The guardrail in advance for the next level is assembled together with the T-frame from the lower, already secured scaffolding level. The scaffolder is therefore in a safe position when entering the next level. This is the basis for fast and safe working procedures. The high load-bearing capacity of the PERI UP T 72 / T 104 frame scaffold allows large bay sizes for all scaffold groups and the work to be carried out. The standard anchor arrangement for PERI UP follows an 8 m offset pattern. Only PERI UP has received official approval to extend this pattern to the edges of the scaffolding. The high frame stability and load capacity of the T-Frame UVT allows many different variations: inside console brackets on every level, additional outside console brackets, protection roofs, nets and tarpaulins.


Technical Details

Brief description

  • standard application: up to 24m height
  • proof available for heights up to approx. 90m

Fast and safe assembly

  • With guard rail in advance together with T-Frame, no additional  components are required
  • Integrated lock against lifting
  • Integrated Fixings for inner guard rail

Load classes/associated deck length

  • Width 72cm:  LK1-LK4
  • Width 104cm: LK1-LK6
  • Steel Deck 32x250cm: <=LK6
  • Steel Deck 32x300cm:<=LK5

Weight

  • T72:   12,0-14,0kg/m²
  • T104: 15,5-17,0kg/m2

Assembly performance

  • Assembly:   T72: 12-15m² per man hour
  • Dismantling: T72: 18-24m² per man hour

Adjustment to the building

  • metric grid dimensions for bay lengths allow easy adjustment
  • any combination with modular scaffold

Technical Approvals

  • approved for the European market

Offered service

  • Scaffold is rentable on a worlwide basis
  • Supervisor
  • Technical support for projects